Home
Published Issues
Author Guide
Editor Guide
Reviewer Guide
journal menu
Aims and Scope
Editorial Board
Indexing Service
Article Processing Charge
Editorial Process
Open Access Policy
Publicatoin Ethics
Contact Us
Copyright and Licensing
Preservation and Repository Policy
General Information
ISSN:
2319-6009 (Online)
Abbreviated title:
Int. J Struct. Civ. Eng. Res.
Frequency:
Quarterly
DOI:
10.18178/ijscer
Average Days to Accept:
68 days
Acceptance Rate:
27%
APC:
500USD
Editor-in-Chief:
Prof. Eric Strauss
Associate Editor:
Assoc. Prof. Wenxing Zhou
Executive Editor:
Ms. Cherry L. Chen
Abstracting/Indexing:
Google Scholar, Cross-ref, CNKI,
etc.
E-mail questions to:
IJSCER Editorial Office
.
Editor-in-Chief
Prof. Eric Strauss
Michigan State University, USA
I am very excited to serve as the Editor-in-Chief of the International Journal of Structural and Civil Engineering Research
(IJSCER)
and hope that the publication can enrich the readers’ experience...
What's New
2025-07-15
July 15, 2025 News! Vol. 14, No. 3, 2025 issue has been published online!
2025-03-19
March 19, 2025 News! Vol. 14, No. 1, 2024 issue has been published online
2024-08-27
August 27th, 2024 News! Vol. 13, No. 3, 2024 issue has been published online
Home
>
Published Issues
>
2016
>
Volume 5, No. 2, May 2016
>
Delays Caused by Project Consultants and Designers in Construction Projects
Mamoon Mousa Atout
Project Management Office, Transmission Power, Dubai Electricity and Water Authority, Dubai, United Arab Emirates
Abstract
—Construction projects in Gulf rejoin presents particular conditions in which the consultant of the project has to concentrate during each phase of design to ensure that it will be accomplished on time, for example, the unrealistic of project duration, foreign designers and consultants, unusual growth of construction industry, the exceptional features of architectural details in the design of projects, and international consultant establishments, firms and office. This paper investigates the main causes of the delays contributed by the projects designers and consultants by representing their roles and responsibilities to hand over the projects on time. The outcome and the results of the study is prepared based on the designed questionnaires and interviews conducted with many consultants and designers intended to identify the causes of delays projects in Gulf region from the viewpoint of the designers. In addition, the required preventive actions of the designers are studied to avoid any impacts on the progress of the project. The study investigates other factors from the client side, contractor side and the appointed project manager might affect the consultant performance on the project.
Index Terms
—design process, roles and responsibility-ties, construction methodology, causes of delay, architects and designers
Cite: Mamoon Mousa Atout, "Delays Caused by Project Consultants and Designers in Construction Projects," International Journal of Structural and Civil Engineering Research, Vol. 5, No. 2, pp. 102-107, May 2016. doi: 10.18178/ijscer.5.2.102-107
5-PM1001
PREVIOUS PAPER
A Study on the BIM-Based Application in Low- Carbon Building Evaluation System
NEXT PAPER
Performance-Based Design Method for Key Techniques in Construction Management of Buildings Translocation Project in China